콘텐츠로 이동

CT-UART-001 Test Result

Go Back to the Pytest TEST All Index


Test summary


Item Value
Description test_uart_timing
Category timing
Environment local
Result PASS
Execution time 0.001 seconds
Execution date 2026-08-19T10:29:18.438759+09:00
Execution ID 20260819_102918_438673


Test configs


Test Item Value
Test ID CT-UART-001
Category timing
Fixture ID FIXTURE-001
Fixture mode mock


FIXTURE-001 Value
Interface UART
Equipment Saleae
Equipment mode mock
Interface mode mock

Test Source


Item Value
Commit 7407acd01cc8747db64636b7cce7c06f6bd9de01
Branch main


Measurement


Item Value
expected_baudrate 921600
measured_baudrate 921596.667
error 3.6168981481902543e-06
jitter 0.00021701388888888888


Statistics


Item Value
mean 921596.6666666666
median 921602.5
min 921490.0
max 921690.0
stddev 67.55656066503748


Logs


  • Path:
    test_reports/results/pytest/test_cases/CT-UART-001


Item Value
Test log 20260819_102918_438673_test.log
Test Result 20260819_102918_438673_result.json


Local LLM Analysis


Item Value
Classification Pass
Confidence 0.95
Analyzer ollama/deepseek-r1:7b
Status enabled


LLM Test Prompt


analyze the test result and provide a detailed report with recommendations for improvement.


Test Result


Item Value
Status PASS
Severity LOW
Warnings 0
Needs Escalation OFF


Test Summary


Item Value
Summary The test for UART timing (CT-UART-001) executed successfully without any errors. The measured baudrate is extremely close to the expected value, differing by a negligible amount of 3.6168981481902543e-06. The jitter observed is also minimal at 0.00021701388888888888 seconds, indicating low timing variability. The test configuration and setup appear to be functioning correctly, utilizing the Saleae equipment in mock mode with the UART interface. The overall performance meets the specified thresholds, and no warnings or critical issues were encountered.
Failure Analysis Test passed without any issues
Source Review Review complete. No significant issues identified.
Warnings None
Recommendations Continue using the current test setup as it is effective and reliable. No changes are needed to the test or equipment configuration. Consider optimizing the test environment further to ensure consistent performance across different scenarios if required.