CT-USB-001 Test Result
Go Back to the Pytest TEST All Index
Test summary
| Item |
Value |
| Description |
test_usb_bulk_loopback |
| Category |
communication |
| Environment |
local |
| Result |
PASS |
| Execution time |
0.000 seconds |
| Execution date |
2026-08-19T09:48:32.914806+09:00 |
| Execution ID |
20260819_094832_914713 |
Test configs
| Test Item |
Value |
| Test ID |
CT-USB-001 |
| Category |
communication |
| Fixture ID |
FIXTURE-002 |
| Fixture mode |
mock |
| FIXTURE-002 |
Value |
| Interface |
USB |
| Equipment |
Digilent |
| Equipment mode |
mock |
| Interface mode |
mock |
Test Source
| Item |
Value |
| Commit |
186b0b454f89ce9fbda6df23966e900b1a3f871f |
| Branch |
main |
Measurement
| Item |
Value |
| bytes_transferred |
256 |
| packet_count |
4 |
| max_packet_size |
64 |
| bus_voltage |
5.0 |
| integrity_error |
0.0 |
Statistics
| Item |
Value |
| endpoint |
1 |
| transfer_count |
1 |
Logs
- Path:
test_reports/results/pytest/test_cases/CT-USB-001
| Item |
Value |
| Test log |
20260819_094832_914713_test.log |
| Test Result |
20260819_094832_914713_result.json |
Local LLM Analysis
| Item |
Value |
| Classification |
Category Communication |
| Confidence |
1.00 |
| Analyzer |
ollama/deepseek-r1:7b |
| Status |
enabled |
LLM Test Prompt
analyze the test result and provide a detailed report with recommendations for improvement.
Test Result
| Item |
Value |
| Status |
PASS |
| Severity |
LOW |
| Warnings |
0 |
| Needs Escalation |
OFF |
Test Summary
| Item |
Value |
| Summary |
The USB communication test has passed with no errors or warnings. The test transferred 256 bytes in 0.000277 seconds, achieved a bus voltage of 5.0V, and had zero integrity errors. All packets were successfully received with a maximum packet size of 64 bytes. The test environment used a Digilent equipment in 'mock' mode operating in 'local' environment with interface mode 'mock' and equipment mode 'mock'. No issues were encountered during the test execution, and all metrics indicate optimal performance. The test logs were examined and found to be clean with no anomalies or errors reported. The test configuration was correctly set up, and the test was executed in a controlled environment without any interference or unexpected behavior. The test passed successfully and can be considered a baseline for future testing. |
| Failure Analysis |
No failures detected during the test execution. All test metrics and parameters were within expected ranges and no issues were observed. |
| Source Review |
No source files were provided for review in this test case. |
| Warnings |
None |
| Recommendations |
1. Verify that the Digilent equipment is functioning correctly and that all connections are properly established. 2. Ensure that the interface settings, including voltage and clock rates, are configured correctly for the communication protocol being used. 3. Consider adding error margins to the test cases if the current margins are too narrow, allowing for some variability in real-world conditions. 4. Implement continuous integration and continuous delivery (CI/CD) pipelines to automate and monitor test runs regularly, ensuring long-term stability and reliability. |