콘텐츠로 이동

CT-USB-001 Test Result

Go Back to the Pytest TEST All Index


Test summary


Item Value
Description test_usb_bulk_loopback
Category communication
Environment local
Result PASS
Execution time 0.000 seconds
Execution date 2026-09-02T10:36:27.898855+09:00
Execution ID 20260902_103627_898772


Test configs


Test Item Value
Test ID CT-USB-001
Category communication
Fixture ID FIXTURE-002
Fixture mode mock


FIXTURE-002 Value
Interface USB
Equipment Digilent
Equipment mode mock
Interface mode mock

Test Source


Item Value
Commit 2fe9b6dc5e4c48e72c174fb96f389aec9ae12f69
Branch main


Measurement


Item Value
bytes_transferred 256
packet_count 4
max_packet_size 64
bus_voltage 5.0
integrity_error 0.0


Statistics


Item Value
endpoint 1
transfer_count 1


Logs


  • Path:
    test_reports/results/pytest/test_cases/CT-USB-001


Item Value
Test log 20260902_103627_898772_test.log
Test Result 20260902_103627_898772_result.json


Local LLM Analysis


Item Value
Classification Pass
Confidence 1.00
Analyzer ollama/deepseek-r1:7b
Status enabled


LLM Test Prompt


analyze the test result and provide a detailed report with recommendations for improvement.


Test Result


Item Value
Status PASS
Severity LOW
Warnings 0
Needs Escalation OFF


Test Summary


Item Value
Summary Test passed successfully with no errors or warnings. The test USB bulk loopback operation was executed without issues. The device under test (Digilent) connected via USB interface maintained stable voltage of 5.0V. The packet transfer was smooth with packet count of 4 and maximum packet size of 64 bytes. The communication was reliable with zero integrity errors. The test duration was very short at 0.0003798999823629856 seconds. All test metrics are within acceptable limits. The communication link is stable and reliable under the given test conditions.
Failure Analysis No failures detected during testing.
Source Review Review completed successfully with no issues identified.
Warnings None
Recommendations 1. Consider enhancing the test coverage by adding stress or edge-case scenarios to ensure robustness. 2. Implement regular system health monitoring to prevent potential failures before they occur. 3. Train operators on proper test procedures to minimize human error.